To prevent contaminated water from seeping into the ground or flowing into nearby rivers and springs, Soudoplast carried out work at the site of the A3 highway’s expansion to 2 × 3 lanes in Bettembourg to ensure the construction and complete waterproofing of a dedicated wastewater drainage system. Specializing in plastic welding and the design of custom synthetic solutions, Soudoplast deployed a high-performance multilayer waterproofing system to seal the basin and secure the connection to the concrete structures.
A rigorous four-step installation methodology:
To ensure absolute watertightness, withstand hydraulic pressures, and guarantee the structure’s longevity in the face of ground conditions, our technicians followed a structured installation protocol.
Step 1: Site preparation and installation of the first geotextile
Before laying any membrane, the excavated soil at the site is cleared of any irregularities. Our teams then install a first layer of puncture-resistant geotextile. This bottom layer acts as a protective barrier between the raw soil and the synthetic lining.
Step 2: Installation of the geomembrane and extrusion-based waterproofing
At the heart of Soudoplast’s work, the protective geomembrane is unrolled and then adjusted to fit the contours of the basin and the siphon manhole. Our specialists then join the geomembrane sections and seal the penetrations through concrete structures using the extrusion sealing technique. The application of molten plastic creates a uniform, continuous, and tear-resistant weld bead, ensuring a completely watertight seal at the joints.
Step 3: Installation of the second geotextile and stabilization with a geogrid
To prevent any risk of damage to the membrane during subsequent backfilling or maintenance phases, a second protective geotextile is installed on top. In addition, a reinforcing geogrid is installed on the slope of the embankments to retain the soil and prevent erosion or landslides along the banks.
Step 4: Finishing the structures and filling the retention basin
The project concludes with the final connection to surface equipment (installation of safety grates and guardrails on the manhole) and the gradual refilling of the retention basin. The system is immediately operational to fulfill its role in regulating water levels and protecting the ecosystem.
Soudoplast’s expertise supporting environmental projects
Thanks to the precision of our assembly techniques and the accuracy of the welds on this highway construction project, this installation ensures a watertight and durable barrier for perfectly controlled and environmentally friendly wastewater drainage.
Do you have a waterproofing project or a specific, custom plastic welding need?